East Terminal

Port Panama City recognized the space limitations of the West Terminal and subsequently initiated expansion efforts to accommodate long-term growth initiatives. This included the purchase of 43 acres of land from WestRock to begin Phase One construction of the East Terminal which included a 900 LF bulkhead refurbishment, 260,000 SF on-port warehouse, rail and road access. This $66 million investment commenced operations in February 2020.

port terminals

Capacity to Meet Your Cargo Needs

  • Phase One features 43 acres, 1 berth, 36-foot draft
  • Significant Port Expansion Investment
  • Commenced Operations in 2020
  • 260,000 SF On-dock Warehousing for forest products
  • Planned Phase Two Expansion: 200,000 SF Warehouse, 600-foot berth extension, and additional paved cargo laydown capacity
  • 200,000 SF paved cargo laydown area
  • Direct access to US 98 and US 231 with Connections to I-10, I-65, and I-85
  • Rail Service provided by the Bay Line Railroad connecting to Norfolk Southern and CSX
  • 27 additional acres of land for future Port development
port terminals

East Terminal Facilities Map

Click the interactive map below for location details.

East Terminal
Warehouse 900 LF Berth Pavement Stevedore Shop 2 Stevedore Shop 1 Truck Bay Security Gate Truck Parking Rail Yard Cargo Lay Down Area Truck Bay Retention Pond Turning Basin

Warehouse

900 LF Berth

Pavement

Stevedore Shop 2

Stevedore Shop 1

Truck Bay

6. Truck Bay

Security Gate

Truck Parking

Rail Yard

Cargo Lay Down Area

Truck Bay

Retention Pond

Turning Basin

Port Panama City’s modern facilities and recently added capacity provides ample space to meet a variety of cargo needs.

  1. Warehouse
  2. 900 LF Berth
  3. Pavement
  4. Stevedore Shop 2
  5. Stevedore Shop 1
  6. Truck Bay
  7. Security Gate
  8. Truck Parking
  9. Rail Yard
  10. Cargo Lay Down Area
  11. Truck Bay
  12. Retention Pond
  13. Turning Basin